Solid Log Materials List
First Floor Materials
- Sill Sealer
- 2×8 P.T. Starter Plate
- 14c 6×8 (EWP) D-Logs (Notch & Pass Corners To Be Cut On Site)
- 10” Self-Tapping Timber Screws, Gasket Tape, Dowel Rods & Log Caulk
- 2×4 or 2×6 Interior Wall Studs (If Required)
- 2×4 or 2×6 Double Top Plate (If Required)
- Interior 2x Door Headers (If Required)
- Exterior Double Hung Windows (If Required)
- Exterior 3-0x6-8 Doors (If Required)
- 5/4”x6” (EWP) Exterior Window & Door Trim
- Precut False Log Corners (As Required)
- Rough Stair Treads & Runners (If Required)
Miscellaneous
- 5 Sets Of CAD Generated Garage Plans (Includes Foundation Plans)
- Roof Designed for a 40lb Snow Load
- Second Floor Designed For A 30/lb Live Load & A 20/lb Dead Load.
- No Specialty LVL Hangers Provided.
Second Floor Materials
- 2x Floor Joist (If Required)
- 2x Ring Joist (If Required)
- ¾” OSB Or Plywood (If Required)
- Solid Blocking & Joist Hangers (If Required)
- LVL Girder For Second Floor Support (If Required)
- 2×4 Exterior Studs, ½” Plywood Sheathing, Weather Barrier ( If Required)
- 2×4 or 2×6 Interior Studs (If Required)
- Single 2×4 Or 2×6 Bottom Plate (If Required)
- 2×4 or 2×6 Double Top Plate (If Required)
- 2×4 Gable Framing
- ½” Gable Plywood
- Vapor Barrier
- 2×8 (EWP) D-Log Siding
- Exterior Windows (As Required)
- 5/4” Exterior Window Trim
- 2x Ceiling Joist (As Required)
- 2x Roof Rafters
- 2x Ridge Beams
- LVL Beams (As Required)
- 5/8” Plywood
- 20# Felt
- 1×8 (EWP) Fascia Boards
- 1×6 (EWP) T&G (Soffits)
- 1×6 (EWP) Corner Trim
- 1×6 (EWP) Exterior Window & Door Trim
***** Garage Doors By Owner *****
******** Shingles By Owner ********